TxDOT Statewide Traffic
Legend
Lane closure is planned.
Lane closure is currently active.
Today
FM 1560 HAUSMAN East
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION FM 1560 BOTH ALTA LOMA FM 1560 HAUSMAN East @ CIRCLE N DR. Unknown
S
M
T
W
T
F
S
Unknown 11/17/2017 at 9:00 AM 11/22/2017 at 3:00 PM NATURE OF WORK: BRIDGE SLAB PLACEMENT ON NEW PHASE OF FM1560 BRIDGE LIMITS: CLOSURE WILL BE FROM ALTA LOMA TO SALTILLO FLAT, FLAGGER SET-UP WILL BE USED TO CONCRETE TRUCKS ENTERING AND EXITING WORK ZONE. THIS WORK IS WEATHER PERMITTING. LANES CLOSED: ALTERNATING
FM 2596 BLANCO RD. North
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
Unknown FM 2596 BLANCO RD. North @ VISTA DEL NORTE Unknown
S
M
T
W
T
F
S
Lane1, Lane2, Lane3 09/27/2017 at 1:10 PM Unknown FM 2696, BLANCO ROAD, WILL BE CLOSED FOR NO MORE THAN 15 MINUTES AT A TIME, ON 10/4/17 AND 10/5/17 FROM 9AM TO 4PM BETWEEN LP 410 AND LOCKHILL SELMA
IH-10 FRONTAGE RD. West
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION IH 10 EAST FRONTAGE RD SOUTH WURZBACH RD IH-10 FRONTAGE RD. West @ WURZBACH RD. Unknown
S
M
T
W
T
F
S
Lane5 11/15/2017 at 9:00 AM 11/22/2017 at 4:00 PM NATURE OF WORK: THE RIOS GROUP (TRG) WILL EXCAVATE TEST HOLES TO DETERMINE THE DEPTH OF UNDERGROUND UTILITIES WITHIN THE GRASSY ROW AS WELL AS UNDER THE PAVEMENT ON WURZBACH RD. TRG'S WORK WITHIN WURZBACH RD WILL BE CONTAINED TO THE RIGHT - HAND EASTBOUND TRAVEL LANE CONTINUING UNDER IH 10 AS SHOWN ON THE ATTCHED EXHIBIT. LIMITS: IH 10 SOUTHBOUND FRONTAGE RD 150' NORTH OF COLONIAL SQUARE AS WELL AS WURZBACH RD & BLUEMEL TO IRONSIDE DRIVE ( RIGHT HAND LANE ONLY) EXISTING LANES: 6 LANES CLOSED: RIGHT ONLY
IH-35 North
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION IH35 SOUTH/NORTH THOUSAND OAKS IH-35 North @ LP-410 Unknown
S
M
T
W
T
F
S
Unknown 11/06/2017 at 9:00 PM 11/26/2017 at 5:00 AM IH35 BOTH DIRECTIONS LAY PFC THOUSAND OAKS TO GEORGE BEACH/ GEORGE BEACH TO THOUSAND OAKS ALT LANES CLOSED WEATHER PERMITTING
IH-35 South
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
Unknown IH-35 South @ OLYMPIA PKWY. Unknown
S
M
T
W
T
F
S
Unknown 11/03/2017 at 5:17 PM Unknown
LP 368 BROADWAY ST. North
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION LP 368 NORTH NATALEN AVE LP 368 BROADWAY ST. North @ NATALEN AVE. Unknown
S
M
T
W
T
F
S
Lane5 11/10/2017 at 9:00 AM 11/29/2017 at 4:00 PM NATURE OF WORK: CONTRACTOR WILL BE WORKING ON BROADWAY ROW ADDING POLES AND MOVING WIRE OVER TO THE NEW POLE. LIMITS: BTW NATALEN AND GROVELAND EXISTING LANES: 6 LANES CLOSED: RIGHT LANE
LP-1604 West
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION LP 1604 WEST (FRONTAGE RD) LP-1604 West @ VANCE JACKSON ROAD Unknown
S
M
T
W
T
F
S
Lane2 09/11/2017 at 9:00 AM 12/01/2017 at 5:00 PM CONSTRUCTION LP 1604 WEST (FRONTAGE RD) LIMITS: LOU MELL DRIVE - VANCE JACKSON EXISTING LANES: 2.. RIGHT LANE CLOSED NATURE OF WORK: POTHOLING EXISTING UTILITIES AND INSTALLATION OF A GAS MAIN IN EASEMENT OUTSIDE OF RIGHT OF WAY
CONSTRUCTION LP 1604 FRONTAGE RD (SOUTH) LP-1604 West @ REDLAND ROAD Unknown
S
M
T
W
T
F
S
Lane1, Lane2, Lane3, Lane4 11/14/2017 at 9:00 AM 11/28/2017 at 4:00 PM CONSTRUCTION LP 1604 FRONTAGE RD (SOUTH) LIMITS: 1604 FRONTAGE RD .. REDLAND AND BULVERDE RD NATURE OF WORK: CONTRACTORS WILL BE WORKING ON MANHOLE
LP-1604 FRONTAGE RD. East
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION LP 1604 FRNTG AND CULEBRA/FM 471 LP-1604 FRONTAGE RD. East @ CULEBRA RD. Unknown
S
M
T
W
T
F
S
Lane3 11/08/2017 at 9:00 AM 12/08/2017 at 4:00 PM LP 1604 FRNTG AND CULEBRAFM 471 CONTRACTOR WILL BE CONSTRUCTIN NEW DRIVEWAY AND WILL NEED OT CLSOE THE RIGHT LANE AFOR EQUIPMENT LIMITS: FRM .5 MILES EAST OF FN 471 TO 1 MILE E OF FM 471 RIGHT LANES CLOSED WEATHER PREMITTING
LP-410 South
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION FM 1346(HOUSTON ST.) AT IH 410 LP-410 South @ HOUSTON ST. Unknown
S
M
T
W
T
F
S
Unknown 03/08/2017 at 9:33 AM Unknown BRIDGE RAIL RETROFIT ON IH 410 AT FM 1346(HOUSTON ST.). ALTERNATING LANES CLOSED. CCJ
CONSTRUCTION LP410 N/S AT VALLEY HI DR LP-410 South @ VALLEY HI DR. Unknown
S
M
T
W
T
F
S
Lane1 11/20/2017 at 9:00 AM 11/22/2017 at 3:00 PM LP 410 NORTH AND SOUTH AT VALLEY HI DR INTERSTATE STREET LIGHTIG ILLUMINATION LIMITS: LP410 N/S FROM VALLEY HI TO IH 37 LEFT LANE CLOSED WEATHER PREMITTING
LP-410 FRONTAGE RD. North
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION IH 410 FR N BIG VALLEY LP-410 FRONTAGE RD. North @ BIG VALLEY DR. Unknown
S
M
T
W
T
F
S
Lane2 11/17/2017 at 12:00 AM 11/22/2017 at 12:00 PM NATURE OF WORK: DEVELOPEMENT PENDING P.E SUBMITTAL ADDRESS DRAINAGE ISSUES, TRAVEL LANE/ ROW LIMITS: BIG VALLEY- 250 PASS FREEDOM HILLS EXISTING LANES: 2 LANES CLOSED: RIGHT
SH 16 North
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION SH 16 BOTH CIRCLE A SH 16 North @ CIRCLE A TRAIL Unknown
S
M
T
W
T
F
S
Lane1, Lane3 11/17/2017 at 9:00 AM 12/31/2017 at 3:00 PM NATURE OF WORK: TURN LANES ON SH 16 AND SH 16 SB, BOTH DESIGNATED LEFT AND RIGHT TURN LANES, SH16 NB AT CIRCLE A RIGHT TURN LANE TO CIRCLE A EAST AND LEFT TURN LANE FM 1560 SB, SH16 SB AT CIRCLE A LEFT TURN LANE TO CIRCLE A LEFT TURN LANE CIRCLE A EAST AND RIGHT TURN LANE TO FM 1560 SB WILL BE CLOSED DUE TI CONSTRUCTION PHASE 2. LIMITS: CLOSURE WILL BE AT CIRCLE a INTERSECTION LANES CLSOED: LEFT AND RIGHT TL
US-90 East
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTIONHWY 90 E TO IH 35NB US-90 East @ IH-35 Unknown
S
M
T
W
T
F
S
Connector 09/15/2017 at 6:51 PM Unknown US 90 EAST SGT REPAIRS AND MOW STRIP REPAIRS LIMITS: US90 EB CONNECTOR RAMP TO IH35NB, WHERE IT MERGES WIHT WB CONNECTOR RAMP, GORE AREA 1 CONNECTOR RAMP CLOSED WEATHER PERMITTING
Future
FM 1535 NW MILITARY HWY East
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION FM1535 N AT CALADIUM DR FM 1535 NW MILITARY HWY East @ CALADIUM DR Unknown
S
M
T
W
T
F
S
Lane2 11/28/2017 at 9:00 AM 11/28/2017 at 4:00 PM FM 1535 NORHT AT CALADIUM DR CONTRACTOR IS INSTALLING NEW FIBER ALONG AND ACROSS FM 1535 FROM CALADIUM DR TO MOSS DR RIGHT LANE CLOSED WEATHER PERMITTING
FM 2536 OLD PEARSALL RD. East
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
Unknown FM 2536 OLD PEARSALL RD. East @ RAY ELLISON DR. Unknown
S
M
T
W
T
F
S
Lane2 11/27/2017 at 9:00 AM 12/22/2017 at 4:00 PM THE RIGHT LANE OF FM 2536 IN BOTH DIRECTIONS BETWEEN RAY ELLSION AND HAYDEN DRIVE WILL BE CLOSED DAILY FROM 9AM TO 4PM STARTING 11/27/17 THRU 12/22/17
IH-10 West
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION IH 10 BOTH LA CANTERA PARKWAY IH-10 West @ LA CANTERA PKWY Unknown
S
M
T
W
T
F
S
Unknown 11/27/2017 at 9:00 PM 12/01/2017 at 5:00 AM NATURE OF WORK: PLACEMENT OF CTB & CRASH CUSHIONS. LIMITS: FROM 1/2 MILE WEST OF RALPH FAIR TO LA CANTERA PKWY EXISITNG LANES: 2 LANES CLOSED: ALTERNATING LANES
CONSTRUCTION IH 10 E/W CAMP BULLIS IH-10 West @ CAMP BULLIS Unknown
S
M
T
W
T
F
S
Unknown 11/28/2017 at 9:00 AM 11/28/2017 at 3:00 PM NATURE OF WORK: BIO HAZARD CLEANUP LIMITS: WESTBOUND TURNAROUND (SOUTH) AT CAMP BULLIS ROAD ( AT IH 10 ). EASTBOUND TURNAROUND ( NORTH) AT CAMP BULLIS ROAD ( AT IH 10) EXISITNG LANES: 1 LANES CLOSED: 1 TURNAROUND LANE
IH-35 North
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION IH 35 N/S GEORGE BEACH IH-35 North @ GEORGE BEACH DR. Unknown
S
M
T
W
T
F
S
Unknown 12/09/2017 at 5:00 AM 12/11/2017 at 5:00 AM NATURE OF WORK: LAY PFC LIMITS: GEORGE BEACH TO THOUSAND OAKS DR. ( NORTH ) THOUSAND OAKS DR. TO GEORGE BEACH DR. ( SOUTH) EXISITNG LANES: 4 LANES CLOSED: ALTERNATE LANE CLOSURES RAMPS CLOSEd: AS NEEDED
IH-35 South
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION IH 35 SOUTH IH-35 South @ LP-410 Unknown
S
M
T
W
T
F
S
Lane4, Lane5 11/27/2017 at 9:00 AM 11/27/2017 at 4:00 PM CONSTRUCTION IH 35 SOUTH LIMITS: IH 35 SB ML AT EXIT RAMP TO LP 410 WB.. GORE AREA NATURE OF WORK: REPAIR (REACT)
IH-35 FRONTAGE RD. South
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION IH 35 SOUTH (FRONTAGE RD) IH-35 FRONTAGE RD. South @ WALZEM Unknown
S
M
T
W
T
F
S
Lane1 11/27/2017 at 9:00 AM 11/27/2017 at 4:00 PM CONSTRUCTION IH 35 SOUTH (FRONTAGE RD) LIMITS: IH 35 SB FRONTAGE RD AT ENTRANCE RAMP COMING FROM FRATT RD.. JUST BEFORE WALZEM RD NATURE OF WORK: REPAIR (REACT)
LP-345 (FRED. RD. INTERSECTIONS) East
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION LP 345 (FRED. RD) NORTH LP-345 (FRED. RD. INTERSECTIONS) East @ WURZBACH RD. Unknown
S
M
T
W
T
F
S
Lane6 11/27/2017 at 9:00 AM 11/28/2017 at 3:00 PM CONSTRUCTION LP 345 (FRED. RD) NORTH LIMITS: DONORE - WURZBACH RD NATURE OF WORK: AT&T CONTRACTOR .. PLACE FIBER CABLE IN EXISTING MH UNDER GROUND DUCT SYSTEM
LP-368 AUSTIN HWY West
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION LP 368 S AUSTIN HWY LP-368 AUSTIN HWY West @ BROADWAY ST. Unknown
S
M
T
W
T
F
S
Unknown 11/27/2017 at 9:00 AM 12/01/2017 at 4:00 PM NATURE OF WORK: CONTRACTOR WILL BE WORKING ON BROADWAY ROW ADDING STORM DRAIN. LIMITS: BTW BROADWAY AND AUSTIN HWY INTERSECTION EXISTING LANES: 6 LANES CLOSED: ALTERNATING RIGHT TO LEFT LANE SB
LP-410 North
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
LP-410 FULL CLOSURE MLS AND FRONTAGE RD BOTH DIRECTIONS MARBACH RD TO US 90 ( SET STELL BEAMS ) LP-410 North @ MARBACH RD. Unknown
S
M
T
W
T
F
S
Left Shoulder, Lane1, Lane2, Lane3, Right Shoulder 12/01/2017 at 8:00 PM 12/04/2017 at 5:00 AM NATURE OF WORK: SET STEEL BEAMS LIMITS; MARBACH RD THRU US 90 EXISTING LANES; 3 LANES CLOSED; FULL CLOSURE RAMPS CLOSED: NONE DETOUR POSTED : AT WORK ZONE
US-281 North
Description Start Location End Location Days Closed in Red Lanes Affected Start Time End Time Notes
CONSTRUCTION US 281 NORTH SONTERRA EXIT RAMP TO SONTERRA ENTRANCE RAMP (SET TEMP TRAFFIC BARRIERS) US-281 North @ SONTERRA BLVD. Unknown
S
M
T
W
T
F
S
Lane3 11/27/2017 at 9:00 PM 12/01/2017 at 5:00 AM NATURE OF WORK; SET TEMP TRAFFIC BARRERLS LIMITS; SONTERRA BLVD EXIT RAMP TO SONTERRA ENTRANCE RAMP EXISTING LANES; 3 LANES CLOSED: RIGHT DETOUR: POSTED AT WORK ZONE